|
|
|
|
| |
|
| |
Extensive quality control checks are carried out at various stages of manufacturing - fabrication Painting Assembly & Wiring, Testing along with inspection of incoming material to maintain the total Quality Concept.
Organisation (TUV Rehenland) ISO 9001 : 2000
|
|
|
|
 |
IP Test for Enclosure
(Tested at ERADA BARODA) |
IS 8623 Part- I |
|
Short Circuit Test (50 KA, 1 Sec) |
IS 8623 Part - II |
|
Heat Run Test (Tested at CPRI BHOPAL) |
IS 8623 Part - II |
|
Routine Test |
IS 13947 |
|
Facility is available for Heat Run Test up to 4000 Amp. |
|
| |
|